Project Inquiry

Customer Substation

System Information
*Depending on the grid connection obligation, the max. approved feed-in power at the grid connection point (GCP) may differ from the installed system power.
**According to the system certification, an uninterruptible power supply (UPS) must be guaranteed for 8 hours to operate the telecontrol connection (FWA). The default output voltage is 24 VDC. Deviations must be indicated.

*Without meaningful system documentation, project planning is delayed or cannot be implemented in a binding manner.
**The project-specific data point list is a prerequisite for the telecontrol connection.
System Information
*Depending on the grid connection obligation, the max. approved feed-in power at the grid connection point (GCP) may differ from the installed system power.
**According to the system certification, an uninterruptible power supply (UPS) must be guaranteed for 8 hours to operate the telecontrol connection (FWA). The default output voltage is 24 VDC. Deviations must be indicated.

*Without meaningful system documentation, project planning is delayed or cannot be implemented in a binding manner.
**The project-specific data point list is a prerequisite for the telecontrol connection.
How can we help you?
Contact Information
Business address
How can we help you?
Contact Information
Business address