Customer Substation

Only possible after complete installation and wiring and with clear knowledge about third-party devices.
- Setting up and testing VPN access.
- Check the documents provided by grid operator.
- Preparation of commissioning and preliminary tests.
- Check the data points and accessibility of the connected devices in the software according to the wiring or grid configuration.
- Configuration of the software for the application.
- Setting up the power plant controller based on the requirements of the grid operator (e. g. E9 sheets in Germany, single line diagrams and control concept).
- The setup of third-party devices (inverters, data loggers, protective devices, measuring devices) is not included.
- Documentation of the software settings via screenshot or PDF export, including software version number.
- The controller description is limited to the WAGO power plant controller. Support for system-specific certification is not included.
- Only possible when purchased via WAGO
- Janitza UMG 96,104,508,604
- A-eberle PQI DA/DE
- A check is made with the grid operator to determine whether communication can be successfully established
- Only possible after successful commissioning of the software.
- The customer is responsible for initiating the signals (e.g. with Omicron) and switching operations.
- The grid operator checks whether all data points can be sent and received according to the data point list.
The Customer is responsible for any damage that may occur during commissioning. WAGO supports commissioning without the entire responsibility for the system. WAGO does not pay for loss of earnings during work.
System Information
*Depending on the grid connection obligation, the max. approved feed-in power at the grid connection point (GCP) may differ from the installed system power.
**According to the system certification, an uninterruptible power supply (UPS) must be guaranteed for 8 hours to operate the telecontrol connection (FWA). The default output voltage is 24 VDC. Deviations must be indicated.

*Without meaningful system documentation, project planning is delayed or cannot be implemented in a binding manner.
**The project-specific data point list is a prerequisite for the telecontrol connection.

Service Package

Only possible after complete installation and wiring and with clear knowledge about third-party devices.
- Setting up and testing VPN access.
- Check the documents provided by grid operator.
- Preparation of commissioning and preliminary tests.
- Check the data points and accessibility of the connected devices in the software according to the wiring or grid configuration.
- Configuration of the software for the application.
- Setting up the power plant controller based on the requirements of the grid operator (e. g. E9 sheets in Germany, single line diagrams and control concept).
- The setup of third-party devices (inverters, data loggers, protective devices, measuring devices) is not included.
- Documentation of the software settings via screenshot or PDF export, including software version number.
- The controller description is limited to the WAGO power plant controller. Support for system-specific certification is not included.
- Only possible when purchased via WAGO
- Janitza UMG 96,104,508,604
- A-eberle PQI DA/DE
- A check is made with the grid operator to determine whether communication can be successfully established
- Only possible after successful commissioning of the software.
- The customer is responsible for initiating the sources (e.g. with Omicron) and switching operations.
- The grid operator checks whether all data points can be sent and received according to the data point list.
The Customer is responsible for any damage that may occur during commissioning. WAGO supports commissioning without the entire responsibility for the system. WAGO does not pay for loss of earnings during work.

System Information

*Depending on the grid connection obligation, the max. approved feed-in power at the grid connection point (GCP) may differ from the installed system power.
**According to the system certification, an uninterruptible power supply (UPS) must be guaranteed for 8 hours to operate the telecontrol connection (FWA). The default output voltage is 24 VDC. Deviations must be indicated.

Device Information


Communication

Network Operator

Direct Marketer

Documentation

*Without meaningful system documentation, project planning is delayed or cannot be implemented in a binding manner.
**The project-specific data point list is a prerequisite for the telecontrol connection.